THIS IS ONE OF 2 ATTACHED LOTS EACH BEING OVER 1 ACRE. UNIQUE LOCATION FOR DEVELOPMENT. THE PROPOSED ULTIMATE IMPROVEMENTS FOR OVERPASS ROAD INCLUDE THE FOLLOWING - 4 LANES FROM OLD PASCO ROAD TO I-75- A NEW INTERCHANGE AT I-75 AND OVERPASS ROAD - SIX LANES PLUS TWO AUXILIARY LANES FROM I-75 TO BOYETTE ROAD - SIX LANES FROM BOYETTE ROAD TO US 301. IN ADDITION TO THESE IMPROVEMENTS, THE EXISTING BLAIR DRIVE ACCESS TO OVERPASS ROAD WILL BE CLOSED AND A NEW 2 LANE PAVED ROADWAY WILL BE CONSTRUCTED WITH A CONNECTION TO OLD PASCO ROAD . THE PROJECT LIMITS EXTEND FROM OLD PASCO ROAD ON THE WEST TO US301 ON THE EAST FOR A TOTAL LENGTH OF APPROXIMATELY 9.0 MILES. THE OVERPASS PROJECT IS CONSISTENT WITH LOCALLY ADOPTED PLANS.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...